Slingco
at PLASA 2005
Stage
Product News Published: 26 August 2005
Slingco - rigging solutions and steel wire specialists –
are at PLASA showcasing their new Vortek system and their CABLEnet
tensioned wire grids.
The company was established in the late 1970's
to provide a range of innovative wire rope-based solutions to
a diverse range of industries including mining, civil engineering,
telecommunications, architecture, marine/offshore, defence &
aerospace.
Since then, Slingco has grown into a major specialist
in and supplier of wire rope and associated products, achieving
ISO9002 quality assurance.
NEW: Vortek – A
Brake with Tradition
Launched earlier this year, Vortek is a complete theatrical
rigging system designed and manufactured by acclaimed stage
machinery innovators, Hoffend Inc. USA, for which Slingco is
the exclusive UK representative.
Work that used to take four-to-six weeks can now be completed
in days utilising Vortek.
The hub of every Vortek system is a unique, patented
brake, specifically designed for theatre applications.
This continuously applied, variable-load, back-up
brake totally eliminates over-speed brake and "shock-load"
type problems.
The brake is connected to the drum, and operates
independently of any electrical or drive-train system. In the
event of all other elements in the drive-train system failing
(including the gear-box), with the Vortek back-up brake; everything
stops within 3mm!
The mechanical Vortek back-up brake also remains
fully functional in the event of a power failure.
Overload/Underload Protection
Vortek also features over-load and under-load protection. Over-load
detection protects the batten in the up direction, preventing
it from picking up tangled curtains, or other unwanted loads.
Under-load protects the batten in the down direction,
stopping it from becoming embroiled in other rigging or driving
scenery into the stage floor. If either condition is sensed,
the system immediately stops.
The adjustable device allows the batten to be
fine tuned to sense an over-load or under-load condition as
little as 2Kg. The Vortek Under-load/Overload battens significantly
enhance a system’s safety for users at all experience
levels.
VAC – The Heart of the Operation
The VAC™ (Vortek Automated Controls) centre is at the
core of the Vortek installation.
Intuitive Touch Screen control and Menuing make the system simple
to administer and use, complete with three levels of password
access.
There are variable speeds, with soft starts and
soft stops. Multiple battens will move to within 0.5 mm in precise
synchronisation - with a touch of the VAC screen. Automated
cueing flies in props, raises and lowers flats and drops and
adjusts lighting pipes simultaneously – all with a touch
of the VAC screen.
A wireless Remote option allows the system to be operated from
various locations around the venue, and a pendant option is
also available.
The Vortek VAC can operate multiple battens together,
and can control up to 250 Vortek units as a rigging system.
With a desktop 32 inches above the ground, the VAC workstation
can be operated from a seated position – enabling wheelchair
users to use VAC with ease and comfort.
CABLEnet
Slingco will also be highlighting its legendary CABLEnet tensioned
wire grid system at PLASA Slingco was the first British-based
company to design, manufacture and install a tension wire grid.
It’s the UK market leader in this innovative
technology and is constantly expanding operations into Europe.
To date, the world's largest tension wire grid installation
is IFEMA in Madrid, Spain's premier exhibition centre.
The CABLEnet system is created by weaving and tensioning high
tensile steel cable within a frame, which is then hoisted to
the required level in a theatre or concert hall to create a
safe 'virtual floor'®. Lighting, audio, AV technicians and
riggers can then work on this in complete confidence.
Virtually invisible from ground level, the system has the key
benefit of casting no shadows from lighting rigs positioned
above.
CABLEnet is incredibly flexible. Systems can
be modular or custom woven on site to accommodate any layout
or room shape. CABLEnet can be installed around features such
as columns, pillars and arches, and sleeves can be incorporated
into the mesh to allow the movement of cable-controlled equipment
through the platform.
Recent Slingco CABLEnet installations include
RADA, Norden Farm, Hampstead Theatre, the Western Studio at
the Millennium Centre in Cardiff and the brand new Junction
2 theatre in Cambridge.